Manufacturer: Simple Systems
K-Lite installs RSA-1 metal road studs with shanks using approved epoxy. When K-Lite supplies the stud, the product and installation carry a three-year guarantee, subject to the published warranty conditions.
Service details
| Specification | Details |
|---|
| Installation rate | 100 studs per hour, per team |
| Included | Installation materials and tools |
| Traffic accommodation | Provided by the customer |
| Establishment | No establishment charge for quantities above 2,000 |
Installation and site preparation
- Provide a safe working area and protect the installation team from traffic.
- Mark positions in accordance with the road authority’s requirements.
- Prepare clean, dry holes and surfaces, free from debris, oil and other contaminants.
- Use the specified two-part epoxy, ensuring the shank and underside are securely bonded. Wear appropriate protective gloves.
- Align each lens towards approaching traffic and keep the lens free from adhesive.
- Inspect workmanship and protect the installation until the adhesive has cured. Curing time depends on the adhesive and ambient conditions.
Drilling requirements
For the RSA-1 metal road stud, drill an installation hole 24 mm in diameter and 65 mm deep.
Project experience
Previous installations include the N12, N17, N3, N2, N1, R27 and N11.